The U.S. Army Corps of Engineers finalized the 2026 Nationwide Permits (NWPs) on January 8, 2026. These permits replace the 2021 Nationwide Permits and will govern a large portion of Clean Water Act Section 404 authorizations nationwide for the next five years. While the overall structure of the nationwide permit program remains largely unchanged, the final rule includes clarifications and targeted revisions that affect how permits are applied, how Clean Water Act Section 401 is implemented, and how state and federal permitting authority is understood.
One of the most discussed changes in the final rule is the removal of Florida from Nationwide Permit 24, which applies in states that have assumed administration of the Section 404 program. Understanding this change requires looking at both how nationwide permits function and how Florida’s assumed program has evolved.
Overview of the Nationwide Permit Program
Nationwide permits are issued by the Corps under Section 404(e) of the Clean Water Act and, where applicable, Section 10 of the Rivers and Harbors Act. They authorize categories of activities that the Corps has determined will result in no more than minimal individual and cumulative adverse environmental effects.
Nationwide permits are designed to streamline permitting for common activities such as utility crossings, bank stabilization, minor road crossings, and maintenance work. They operate subject to:
- Nationwide permit specific terms and limits
- Nationwide General Conditions
- Regional conditions imposed by Corps divisions
- Clean Water Act Section 401 water quality certification
- Pre construction notification requirements where applicable
The 2026 Nationwide Permits become effective March 15, 2026 and are scheduled to expire on March 14, 2031.
Key Themes in the 2026 Nationwide Permits
The 2026 NWPs do not represent a major expansion or contraction of the program. Instead, the final rule emphasizes clarity and consistency. Notable themes include:
- Clarification of how Section 401 water quality certification applies to nationwide permits
- Greater emphasis on compliance with general conditions
- Reinforcement of district engineer discretion through regional conditions
- Clarification of how multiple nationwide permits may be used for a single project
These changes reflect a broader trend toward strengthening the administrative record and reducing ambiguity in permit implementation.
What Nationwide Permit 24 Is
Nationwide Permit 24 is different from most nationwide permits because it applies only in states that have assumed administration of the Clean Water Act Section 404 program under Section 404(g).
When a state assumes the Section 404 program, it becomes the primary permitting authority for most discharges of dredged or fill material into waters of the United States. Federal law, however, does not allow states to assume jurisdiction over all waters. The Corps retains authority over traditionally navigable waters, waters subject to Section 10, and certain adjacent waters.
Nationwide Permit 24 exists to authorize activities in those retained federal waters within assumed states. Its use depends on a clear and legally stable division of permitting authority between the state and the Corps.
Florida’s Section 404 Program Background
Florida began administering a state Section 404 program in December 2020 following approval by the U.S. Environmental Protection Agency. The assumption did not transfer all federal permitting authority to the state. As a result, Florida operated under a divided regulatory framework in which both the state and the Corps issued permits depending on the type and location of waters affected.
Following EPA’s approval, litigation challenged whether the approval complied with the Endangered Species Act, particularly with respect to program level consultation. Federal courts vacated portions of the approval, creating uncertainty regarding the legal foundation of the assumed program.
Removal of Florida From Nationwide Permit 24
In the 2025 proposed Nationwide Permits, Florida continued to be listed as an assumed state under Nationwide Permit 24. The proposal did not suggest removing Florida or solicit comment on that issue.
In the 2026 final rule, the Corps removed Florida from Nationwide Permit 24. The Corps described this change as administrative and stated that it does not affect the number of activities authorized by nationwide permits. The removal aligns the nationwide permits with the current legal status of Florida’s Section 404 program at the time of finalization.
The change becomes effective March 15, 2026, when the 2026 Nationwide Permits take effect.
Practical Implications for Permitting in Florida
With Florida no longer listed under Nationwide Permit 24, the Corps remains the primary federal permitting authority for Section 404 activities involving waters of the United States in Florida, subject to the limits of federal jurisdiction.
Projects in Florida may still rely on other applicable nationwide permits or individual permits issued by the Corps, provided all applicable requirements are met. Clean Water Act Section 401 water quality certification remains required before a nationwide permit authorization becomes valid.
From a practical standpoint, the change underscores the importance of:
- Verifying permitting authority early in project planning
- Confirming which nationwide permits apply
- Tracking state Section 401 certification decisions and conditions
- Accounting for regional conditions imposed by the Corps
Broader Context
The Florida Nationwide Permit 24 issue highlights how nationwide permits depend on program level legal stability. Nationwide permits are intended to operate consistently across Corps districts. When the status of a state assumed program is uncertain, applying a permit designed specifically for assumed states becomes more complex.
The final rule does not resolve broader questions about the future of Florida’s assumed Section 404 program. Those issues remain subject to future administrative actions and court decisions.
Looking Ahead
The 2026 Nationwide Permits will guide federal wetland permitting through 2031. While many aspects of the program remain familiar, understanding targeted changes and state specific issues such as Florida’s status under Nationwide Permit 24 is essential for effective compliance and project planning.
The Swamp School will be addressing these topics in upcoming training, including a Nationwide Permits webinar on February 19, 2026, which will provide a detailed review of the final permits and their practical implications.